Street Improvements To Begin In Pittsburg

Street Improvements To Begin In Pittsburg
COPYRIGHT 2018 BY KOAM. ALL RIGHTS RESERVED. THIS MATERIAL MAY NOT BE PUBLISHED, BROADCAST, REWRITTEN OR REDISTRIBUTED.
road closed.jpg

The city of Pittsburg is gearing up for road improvements next week. Weather permitting crews will begin work on several streets on Monday, September 24. This work consists of milling of the existing asphalt, overlay of a new asphalt surface and installation of traffic pavement marking.

The milling operation will start in Countryside Addition begging at the north end and moving south. Once the streets in this addition are completed, the contractor will move to West Quincy Street. New asphalt pavement and traffic pavement marking will be installed once the milling is completed.

City officials say motorists should expect traffic changes and delays during construction. Even though traffic control will be in place to allow traffic to use all the streets in the area of construction, traffic will be slowed due to lane closures. Side streets could also be temporarily closed as the pavement operation moves through the intersections. Motorists are encouraged to seek alternate routes when possible, to use extreme caution when traveling in the area of construction, and be aware of workers in the work zone.

The project areas consist of the following:

West Quincy (Broadway to the west city limits) Countryside Addition Cambridge Lane Canterbury Road Colonial Drive Countryside Drive Heritage Lane Heritage Road Victorian Drive Villa Drive Village Drive Windsor Circle Windsor Court Windsor Drive

You find more information at the following link: https://www.pittks.org/news/2018-street-improvements-to-begin-september-24/